Title Comparative Analysis of Conventional Tact and Compositive Tact in Apartment House Finishing Construction
Authors Hwang, SuHyeon ; Sim, JeaHyung ; Ham, NamHyuk ; Kim, JaeJun
DOI https://dx.doi.org/10.6106/KJCEM.2022.23.4.047
Page pp.47-56
ISSN 2005-6095
Keywords Tact; Tact Process Management; Apartment House; Finish Work; Plaster Work
Abstract In a construction project, process planning is an important factor in determining the success or failure of a project. In particular, it is necessary to systematically establish a process plan in the early stage because the finishing work of an apartment house involves more interference than the foundation work or the frame work. First, in this study the problems of Tact process management were identified, Based on the data from the case project, conventional Tact process management and compositive Tact process management were compared and analyzed. Second, cost analysis was performed on applicable plastering work to suggest the necessity and direction of compositive Tact process management. Third, the appropriateness of manpower according to the number of construction households is analyzed through cost analysis. Through this, the validity and effectiveness of compositive Tact process management were verified based on the results derived from this study.