Title A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project
Authors Park, Bo-sung ; Kim, Ok-kyue
DOI https://dx.doi.org/10.6106/KJCEM.2022.23.5.056
Page pp.56-64
ISSN 2005-6095
Keywords CM at Risk; VE; Job Plan; Pre-Construction Phase; GMP
Abstract Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.