Mobile QR Code QR CODE : Journal of the Korean Institute of Illuminating and Electrical Installation Engineers

Journal of the Korean Institute of Illuminating and Electrical Installation Engineers

ISO Journal TitleJ Korean Inst. IIIum. Electr. Install. Eng.

References

1 
Z. Cen and P. Stewart, “Condition parameter estimation for photovoltaic buck converters based on adaptive model observers,” in IEEE Transactions on Reliability, vol. 66, no. 1, 2017.DOI
2 
A. G. Abo-Khalil and D. C. Lee, “DC-Link capacitance estimation in AC/DC/AC PWM converters using voltage injection,” in IEEE Transactions on Industry Applications, vol. 44, no. 5, pp. 1631-1637, 2008.DOI
3 
N. Agarwal, A. Arya, M. W. Ahmad, and S. Anand, “Lifetime monitoring of electrolytic capacitor to maximize earnings from grid-feeding PV system,” in IEEE Transactions on Industrial Electronics, vol. 63, no. 11, pp. 7049-7058, 2016.DOI
4 
J. K. Yang, “Fault diagnosis of DC link electrolytic capacitors in inverter,” Trans. Korean Inst. Power Electron. vol. 18, no. 2, pp. 145-152, 2013.URL
5 
S. Yin, S. Ding, X. Xie, and H. Luo, “A review on basic data-driven approaches for industrial processmonitoring,” in IEEE Transactions on Industrial Electronics, vol. 61, no. 11, pp. 6418-6428, 2014.DOI
6 
W. Miao, X. Liu, K. H. Lam, and P. W. T. Pong, “Condition monitoring of electrolytic capacitors in boost converters by magnetic sensors,” in IEEE Sensors Journal, Vol. 19, no. 22, pp. 10393-10401, 2019.DOI
7 
S. Sapna, A. T., and M. Kumar, “Backpropagation learning algorithm based on levenberg marquardt algorithm,” Computer Science & Information Technology, vol. 2, no. 4, pp. 393-398, 2012.DOI