Title A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project
Authors Yun, Seok-Heon ; Kim, Seong-Sig
Page pp.119-127
ISSN 1229-7534
Keywords Schedule-Cost Integration ; QDB
Abstract Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.