A Survey on the Persons in Charge for Economic Estimation Analysis and Improvement of BTL Projects
Application System Improvement of the Codes and Standards for Plant Design
A Model of the Construction Risk Management System for Site Personnel in the Construction Project
A Study of Qualitative and Quantitative Risk Assessment for Highway Safety Facilities
Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage
A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project
Development of the Construction Waste Management Performance Evaluation Tool (WMPET):Quantification of Waste Management Performance Factors and Establishment of Waste Management Performance Evaluation Tool
A Study on the Effectiveness Verification of Construction CRM systems
The Development of Economical Index for Site Recycling of Waste Concrete
Development of Cost Estimating Model Using Quantity Variation Analysis by Influence Variables for the Schematic Design Phase