Title Decision Making Process for Alternative Selection of Proper Design Change in Construction Project
Authors Lee, Jong-Sik ; Chun, Jae-Youl
Page pp.74-82
ISSN 1229-7534
Keywords Design Change ; Building System ; Decision-Making ; Constraint ; Goodness of Fit
Abstract A government agency has been announced to increase 23,663 hundred million wons by cost of design change which occurred in the pre-construction and construction phase. As design change is a phenomenon to occur by means of a characteristic of the building design that standardization is difficult, even if it is said that a perfect design is done in design phase, design change is prevented, and it is going to decrease, and there is a limit. Because there are some causes in all of the construction project, it is change order of client, relative system, unfit design and field condition, etc. In this study, we are suggested logic and basic model of the decision making support process model that it should selecting the optimal alternative through complex and quantitative analyzed: that is cost, performance and constructability as respect Owner or CMr is executing project under the CM delivery system construction project which it occurred design change.