Estimation and Analysis of Groundwater Recharge in Korea
The Selection of Appropriate Probability Distributions for Annual Maximum Rainfall Data
Three - Dimensional Boundary Integral Equation Method : Interior Element Calculation
A Study on the Increment of Storage Capacity and Effective Management Techniques of Paldang Dam
A Study on the Optimal Location of Pumping Stations in Branched Pipeline Systems
Estimation of the Flood Arrival Time by Serial Correlation Analysis Method
A Study of Waves in the Estuary of Nakdong River
Long Waves Generated by Short Wave Groups : Derivation of Governing Equations
Characteristics of Leachate and Ways of Usage of Polluted Dredged Sediments in the Nak Dong River