References

1 
Altun, M., Sonmez, R., and Akcamete, A. (2020). “A mixed integer programming method for multi-project resource leveling.” Journal of Construction Engineering, Management & Innovation, 3(2), 131-140. https://doi.org/10.31462/jcemi.2020.02131140DOI
2 
Alvin, N., and Yang, I.T. (2023). “Multi-resource allocation and leveling in multi-project scheduling problem with hybrid-chromosome non-dominated sorting genetic algorithm II.” Dimensi Utama Teknik Sipil, 10(2), 232-251. https://doi.org/10.9744/duts.10.2.232-251DOI
3 
Burgess, A.R., and Killebrew, J.B. (1962). “Variation in activity level on a cyclical arrow diagram.” Journal of Industrial Engineering, 13(2), 76-83URL
4 
Cheng, M.Y., Prayogo, D., and Tran, D.H. (2016). “Optimizing multiple-resources leveling in multiple projects using discrete symbiotic organisms search.” Journal of Computing in Civil Engineering, 30(3), 04015036. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000512DOI
5 
Damci, A., Arditi, D., and Polat, G. (2013). “Multiresource leveling in line-of-balance scheduling.” Journal of Construction Engineering and Management, 139(9), 1108-1116. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000716DOI
6 
Easa, S.M. (1989). “Resource leveling in construction by optimization.” Journal of Construction Engineering and Management, 115(2), 302-316. https://doi.org/10.1061/(ASCE)0733-9364(1989)115:2(302)DOI
7 
El-Rayes, K., and Jun, D.H. (2009). “Optimizing resource leveling in construction projects.” Journal of Construction Engineering and Management, 135(11), 1172-1180. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000097DOI
8 
Guo, Y., Li, N., and Ye, T. (2009). “Multiple resources leveling in multiple projects scheduling problem using particle swarm optimization.” In 2009 Fifth International Conference on Natural Computation, IEEE, 3, 260-264. https://doi.org/10.1109/icnc.2009.142DOI
9 
Hariga, M., and El-Sayegh, S.M. (2011). “Cost optimization model for the multiresource leveling problem with allowed activity splitting.” Journal of Construction Engineering and Management, 137(1), 56-64. https://doi.org/10.1061/(asce)co.1943-7862.0000251DOI
10 
Hegazy, T. (1999). “Optimization of resource allocation and leveling using genetic algorithms.” Journal of Construction Engineering and Management, 125(3), 167-175. https://doi.org/10.1061/(asce)0733-9364(1999)125:3(167)DOI
11 
Jun, D.H., and El-Rayes, K. (2011). “Multiobjective optimization of resource leveling and allocation during construction scheduling.” Journal of Construction Engineering and Management, 137(12), 1080-1088. https://doi.org/10.1061/(asce)co.1943-7862.0000368DOI
12 
Li, H., and Demeulemeester, E. (2016). “A genetic algorithm for the robust resource leveling problem.” Journal of Scheduling, 19, 43-60. https://doi.org/10.1007/s10951-015-0457-6DOI
13 
Ponz-Tienda, J.L., Yepes, V., Pellicer, E., and Moreno-Flores, J. (2013). “The resource leveling problem with multiple resources using an adaptive genetic algorithm.” Automation in Construction, 29, 161-172. https://doi.org/10.1016/j.autcon.2012.10.003DOI
14 
Senouci, A.B., and Eldin, N.N. (2004). “Use of genetic algorithms in resource scheduling of construction projects.” Journal of Construction Engineering and Management, 130(6), 869-877. https://doi.org/10.1061/(asce)0733-9364(2004)130:6(869)DOI
15 
Son, J., and Skibniewski, M.J. (1999). “Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach.” Journal of Construction Engineering and Management, 125(1), 23-31. https://doi.org/10.1061/(asce)0733-9364(1999)125:1(23)DOI