References

1 
Baek, S.W., Han, S.H., Jung, W.Y., (2019). “A Comparative Analysis of Risk Assessment Depending on International Project Types.” Korean Journal of Construction Engineering and Management, KICEM, 20(5), 125-136. https://dx.doi.org/10.6106/KJCEM.2019.20.5.125DOI
2 
Go, H.J., Hyun, J.H. Lee, J.H., and Ahn, J.S., (2022). “Development of A Quantitative Risk Assessment Model by BIM-based Risk Factor Extraction.” Korean Journal of Construction Engineering and Management, KICEM, 23(4), 15-25. https://dx.doi.org/10.6106/KJCEM.2022.23.4.015DOI
3 
Hwang, S.Y., Lee, W.J., Lee, S.G., and Lee, S.K., (2022). “Automatic Creation Process for Task Risk Assessment Checklist using BIM and Ontology.” Proceeding of KICEM Annual Conference, KoreanURL
4 
Yang, Z., Stephen, W.J., and Arto, K. (2017). “A Review of Risk Management Through BIM and BIM-Related Technologies.” Safety Science, 97, 88-98DOI
5 
Jeong, S.H., Kim, G.H., (2024). “Development of BIM Utilization Evaluation Model in Construction Management Company.” Korean Journal of Construction Engineering and Management, KICEM, 25(4), 24-33. https://dx.doi.org/10.6106/KJCEM.2024.25.4.024DOI
6 
Kim, T.H., Lee, D.H. Bae, S.I., Hong, Y.K., and Park, Z.S., (2013). “Proposal of Field Applied Safety Control Process Using BIM.” Journal of the Architectural Institute of Korea, AIK, 15(5), 243-250URL
7 
Kim, H.S., Moon, H.S. Choi, G.Y., Kim, C.H., and Kang, L.S., (2012). “Development of BIM Functions and System for Construction Project through Project Life Cycle.” Korean Journal of Construction Engineering and Management, KICEM, 13(2), 11-24. https://dx.doi.org/10.6106/KJCEM.2012.13.2.011DOI
8 
Kim, H.S., Lee, H.S., Park, M.S., and Hwang, S.J., (2011). “Information Retrieval in Construction Hazard Identification.” Korean Journal of Construction Engineering and Management, KICEM, 12(2), 53-63. https://doi.org/10.6106/KJCEM.2011.12.2.53DOI
9 
Kim, W.J., Park, J.H., Cha, Y.W., Hyun, C.T., and Han, S.W., (2019). “Development of Model Requirements Checklist for Utilization BIM in Construction Phase.” Korean Journal of Construction Engineering and Management, KICEM, 20(1), 22-31. http://dx.doi.org/10.6106/KJCEM.2019.20.1.022DOI
10 
Kang, H.W., (2022). “Risk based Value Index Evaluati on Model for Modular Design Alternatives in Plant Construction Projects.” Korean Journal of Construction Engineering and Management, KICEM, 23(5), 98-107. https://doi.org/10.6106/KJCEM.2022.23.5.098DOI
11 
Lee, J.H., Hyun, J.H., Kim, H.S., Park, H.B., and Ahn, J.S., (2022). “A Proposal for Visualization of Risk through BIM-based Construction Site Risk Assessment System.” Proceeding of KICEM Annual Conference, KoreanURL
12 
Park, J.E., and Yu, J.H. (2016). “BIM-based Repair & Replacement Cost Estimating Process.” Korean Journal of Construction Engineering and Management, KICEM, 17(2), 31-38. https://dx.doi.org/10.6106/KJCEM.2016.17.2.031DOI
13 
Ministry of Land Infrastructure and Transport. (2022). Implementation Guidelines for BIM in Construction IndustryURL
14 
Hansol Academy. (2017). 3D Architectural Design for Must BIMURL