References

1 
Hwang, H.S. (2019). “System and method for automatic calculation of WBS cost by using work classification system and automatic quantity calculation by object position.” Korean Intellectual Property Office. https://doi.org/10.8080/1020190007043DOI
2 
Kim, H.D., Nam, J.Y., Kim, Y.J., and Ryu, I.H. (2023). “Methods for Quantitative Disassembly and Code Establishment of CBS in BIM for Program and Payment Management.” Journal of Computational Structural Engieering Institute of Korea, JCOSEIK, 36(6), 381-389. https://doi.org/10.7734/COSEIK.2023.36.6.381DOI
3 
Kim, H.D., and Nam, J.Y. (2024). “Advanced CBS (Cost Breakdown Structure) Code Search Technology Applying NLP (Natural Language Processing) of Artificial Intelligence.” Journal of Civil and Environmental Engineering Research, KSCE, 44(5), 719-731. https://doi.org/10.12652/Ksce.2024.44.5.0719DOI
4 
Korea Expressway Corporation (EX) (2022). “Expressway BIM Information System Standard Guideline.” https://blog.naver.com/ds1qmk/223133171338 (Oct. 23, 2024)URL
5 
Korea Land & Housing Corporation (LH) (2022). LH BIM Application Guideline (Civil in Complex)URL
6 
Ministry of Land, Infrastructure and Transportation (MOLIT) (2020). Construction Industry BIM Basic GuidelineURL
7 
Ministry of Land, Infrastructure and Transportation (MOLIT) (2022). Construction Industry BIM Implementation Guidelines (Employer, Contractor, Designer)URL
8 
Shin, J.C., Hwang, J.H., Lee, S.G., and Lee, S.W. (2012). “BIM based Reliability Analysis and Automated Quantity Calculation.” Journal of the Korean Society of Hazard Mitigation, KOSHAM, 12(3), 49-55. https://doi.org/10.9798/KOSHAM.2012.12.3.049DOI