Effectiveness Assessment of Additional Gate Installation at a Railway Station: Case Study at Gwang-Myeong Station
Basic Study for Selection of Factors Constituents of User Satisfaction for Micro Electric Vehicles
A Benchmarking Study for Deriving Data-driven Asset Management Strategy: U.S. Federal Transit Administration (FTA) Case
A Study on Considering Non-Working Days for Determination Normal Project Duration in the Railway Bridgework Construction
Improving the Landscape through Image Analysis of the Residential Area Behind the Port