A Study on Actual Conditions and Alternative Methods about FeasibilityStudy of Architectural Development Projects
Visualization of Process and Inference of Assemble Sequence Using 3-Dimensional CAD Data
A Study on the Selection of Retaining Wall Methods Using Neural Networks and Case-Based Reasoning
A Strategic Plan of PE System for Enhancing the Global Competitiveness
Modified Delay Analysis Considering Production Rates
Estimation of Labor Demand by Business Fluctuationsin the Construction Market
Impacts of Pre-construction Design Quality on Construction Durations and Costs